Splityard Creek Dam

Dam in South East Queensland
27°22′16″S 152°38′13″E / 27.37111°S 152.63694°E / -27.37111; 152.63694PurposeHydroelectricity[1]StatusOperationalConstruction began1977 (1977)Opening date1980 (1980)Dam and spillwaysType of damEmbankment damImpoundsPryde CreekHeight76 m (249 ft)[1]Length1,140 m (3,740 ft)[1]Dam volume69×10^3 m3 (2.4×10^6 cu ft)[1]Spillway typeUncontrolledSpillway capacity570 m3/s (20,000 cu ft/s)[1]ReservoirTotal capacity28,700 ML (6,300×10^6 imp gal; 7,600×10^6 US gal)[1]Catchment area3.8 km2 (1.5 sq mi)[1]Surface area105 ha (260 acres)[1]Maximum width294 m (965 ft)Wivenhoe Power StationOperator(s)CS EnergyCommission date1984 (1984)TypePumped-storageTurbines2Installed capacity500 megawatts (670,000 hp)Website
Wivenhoe Power Station

The Splityard Creek Dam is a rock and earth-fill embankment dam with an un-gated spillway across the Pryde Creek that is located in the South East region of Queensland, Australia. The sole purpose of the dam is for the generation of hydroelectricity.[1] The impounded reservoir is called the Splityard Creek Reservoir.

Location and features

The dam is located 30 kilometres (19 mi) northwest of Ipswich in the Somerset Region and forms the upper reservoir for the Wivenhoe Power Station.

Construction commenced in 1977 and was completed in 1980 by contractors Thiess Brothers and John Holland.[2] The rock and earthfill dam structure is 76 metres (249 ft) high and 1,140 metres (3,740 ft) long. The 3,371-thousand-cubic-metre (119.0×10^6 cu ft) dam wall holds back the 28,600-megalitre (6,300×10^6 imp gal; 7,600×10^6 US gal) reservoir when at full capacity. From a catchment area of 3.8 square kilometres (1.5 sq mi), the dam creates a reservoir with a surface area of 102 hectares (250 acres). The uncontrolled un-gated spillway has a discharge capacity of 570 cubic metres per second (20,000 cu ft/s).[1] The asset was transferred to CleanCo Queensland in October 2019.

Power station

Owned by CleanCo Queensland and operated by CS Energy, Wivenhoe Power Station is located on the eastern side of Wivenhoe Dam, north west of Brisbane. The station, which began commercial operation in 1984, was Queensland's first pumped-storage hydro-electric plant. It is operated remotely from an operating centre used to manage the Queensland electricity grid.[3]

The dam's water capacity is enough for the power station to run at full load for approximately ten hours. Using both pumps, this water can be replaced in about 14 hours. The pumped storage power station consists of two circular concrete silos, each of about 32 metres (105 ft) internal diameter. Each of the silos houses a 250 megawatts (340,000 hp) turbine generator and pump set, giving a total capacity of 500 megawatts (670,000 hp).[3]

Recreation

Public access including swimming is banned from the dam due to strong currents and submerged hazards.

See also

  • flagQueensland portal
  • iconWater portal

References

  1. ^ a b c d e f g h i j "Register of Large Dams in Australia". Dams information. Australian National Committee on Large Dams. 2010. Archived from the original (Excel (requires download)) on 12 December 2013. Retrieved 4 July 2014.
  2. ^ "Wivenhoe Power Station: Official Opening" (PDF). Queensland Flood Commission. Retrieved 4 January 2019.
  3. ^ a b "Wivenhoe Dam". Seqwater. Retrieved 6 December 2012.

External links

Wikimedia Commons has media related to Splityard Creek Dam.
  • v
  • t
  • e
Water supply in Queensland, Australia
Dams and reservoirs by region
South East Queensland
Darling Downs
South West Queensland
Wide Bay–Burnett
Central Queensland
North Queensland
Far North Queensland
North West Queensland
Historical
Companies and government agencies
Other sources / facilities
Regulators
  • Department of Energy and Water Supply
Historical
  • Dams category
  • Water management category
  • Commons