Laurel Hill Tunnel

Abandonded tunnel in Pennsylvania, United States

40°6′0.4″N 79°13′38.4″W / 40.100111°N 79.227333°W / 40.100111; -79.227333StatusClosed to traffic, leased to Chip Ganassi Racing for testingCrossesLaurel HillOperationWork begun1881, railway
1938, highwayConstructed1881–1885, railway
1938–1940, highwayOpenedOctober 1, 1940ClosedOctober 30, 1964, I-70/I-76OwnerPennsylvania Turnpike CommissionTechnicalLength5,450 ft (1,660 m), railway
4,541 ft (1,384 m), highwayNo. of lanes2

Laurel Hill Tunnel is a 4,541-foot-long (1,384 m) tunnel on the Pennsylvania Turnpike that was bypassed and abandoned in 1964. It is bored through Laurel Ridge, spanning the border of Westmoreland and Somerset counties. Its western portal may be seen from the eastbound side of the Turnpike at milepost 99.3.

The tunnel was built for the never-completed South Pennsylvania Railroad, as were two other tunnels to its east—Sideling Hill and Rays Hill—that were similarly on the original Turnpike and abandoned after being bypassed.

Bypass

The point eastbound where the turnpike curves north (to the left) to bypass the Laurel Hill Tunnel. The abandoned tunnel can be seen where there is a path of trees removed from the top of the mountain. Notice the jersey barriers end with the beginning of a wide grassy median.

The tunnels on the Turnpike had been bottlenecks ever since the Turnpike's opening in 1940 due to reduced speeds and two-way traffic in a single tube. A second tube was added to four tunnels—Allegheny Mountain, Tuscarora Mountain, Kittatinny Mountain, and Blue Mountain—where it was the less expensive option.

Unlike the Sideling Hill and Rays Hill tunnels, the Laurel Hill Tunnel is not on the bypassed section commonly known as the Abandoned Pennsylvania Turnpike and is still owned by the Pennsylvania Turnpike Commission. It is not open to the public and is routinely patrolled by the Pennsylvania State Police for trespassers.[1]

The highest point on the Turnpike, 2,603 feet (793 m), is on the Laurel Hill Tunnel bypass at Mile 100.45 in Somerset County.

Testing use

The tunnel is used by Chip Ganassi Racing for high-speed race car aerodynamic testing. The tunnel has been repaved, equipped with climate control, safety equipment, and data collection systems. The tunnel was first used for testing in 2004 to develop the G-Force Indycar.[2][3]

See also

References

  1. ^ "Abandoned Turnpike FAQ". Retrieved September 24, 2016.
  2. ^ "The Secrets of Laurel Hill Revealed". Racecar Engineering. September 24, 2014. Retrieved October 4, 2014.
  3. ^ "The Secret Racing Test Tunnel No One Wants to Talk About". Road and Track. January 9, 2015. Retrieved January 11, 2015.
  • v
  • t
  • e
Pennsylvania Turnpike Commission
Completed highways
Partially completed highwaysTunnels and bridgesAborted expansion plansHistorical structuresTolling systems
  • v
  • t
  • e
Chip Ganassi Racing
Headquarters: Indianapolis, Indiana
Personnel
IndyCar Series
Drivers
IMSA SportsCar Championship
Drivers
Extreme E
Drivers
Former drivers
NASCAR
Indy cars
Other
Indianapolis 500 wins
National Championships (IndyCar)
NASCAR Hall of Fame
Daytona 500 wins
Brickyard 400 wins
All-Star Race wins
24 Hours of Le Mans wins
24 Hours of Daytona wins
Predecessor teams
Buyouts and mergers
Facilities
  • Laurel Hill Tunnel (testing facility)
Partnerships
and affiliations
Related articles