Gombak LRT station
Preceding station | Following station | |||
---|---|---|---|---|
Terminus | Kelana Jaya Line | Taman Melati towards Putra Heights | ||
Future development | ||||
Preceding station | Malaysia Rail Link | Following station | ||
Gombak Utara towards Kota Bharu | East Coast Rail Link | Terminus |
Gombak (previously known as the Terminal PUTRA LRT station) is an LRT station in Gombak District, Selangor, Malaysia. It is the northern terminus for the RapidKL Kelana Jaya Line.
There is a ticket counter for buses to Genting Highlands, with buses departing to the Genting Skyway station every half-hour.[3] These buses are operated by Resorts World Berhad. This station is normally utilised by residents of Kuala Lumpur, especially those living around Setapak area when they are going to Genting.
The Gombak toll plaza, the beginning of the East Coast Expressway (LPT) East Coast Expressway, is one kilometre north from this station.
Currently this station is the northernmost in the RapidKL rail transport network.
Plans
Under the Ninth Malaysia Plan, the transportation hub called Gombak Integrated Transportation Terminal (GITT) are plan to cater for express buses coming in from the east coast of Malaysia similar to Terminal Bersepadu Selatan, an integrated hub in Bandar Tasik Selatan.[4] As of 2022, construction was started and will be connecting with LRT station and under construction of MRL East Coast Rail Link (ECRL).[5][6][7]
Connections
Route No. | Via | Connecting to | Reachable |
---|---|---|---|
T200 | Jalan Taman Melati 1/5 Kuala Lumpur Middle Ring Road 2 (MRR2) Lingkaran UIA | 200 | IIUM |
T201 | Jalan Taman Melati 1/5 Kuala Lumpur Middle Ring Road 2 (MRR2) Lebuh Utama Sri Gombak Jalan Makmur Jalan Lintang Jalan Permai Jalan Gombak Permai 2 | 170 171 202 BET17 | Al-Khairiah Mosques(Taman Seri Gombak) Sri Gombak Commercial Centre SMK Hillcrest Taman Prima Sri Gombak |
MPS1 | Jalan Taman Melati 1/5 Kuala Lumpur Middle Ring Road 2 (MRR2) Jalan Sungai Pusu Jalan Gombak KC05 KTM Batu Caves Jalan Sungai Tua Selayang Baru Kepong–Selayang Highway Bandar Baru Selayang | 151 | SBP Integrasi Gombak SK Gombak Utara SK Sungai Pusu Gombak Vocational College Sri Gombak Commercial Centre Giant Hypermarket Batu Caves Sungai Chinchin Mosques |
Genting Express | East Coast Expressway (KARAK) | Awana Skyway | Genting Highlands Chin Swee Caves Temple Genting Highlands Premium Outlets |
See also
- Kelana Jaya Line
- MRL East Coast Rail Link
- Klang Valley Integrated Transit System
- Rail transport in Malaysia
References
- ^ "ABOUT RAPID RAIL". Retrieved May 8, 2020.
- ^ "Stations with Park N' Ride". Myrapid. Archived from the original on 6 November 2018. Retrieved 8 May 2020.
- ^ Berhad, Genting Malaysia. "Resorts World Genting". www.rwgenting.com. Retrieved 2020-05-08.
- ^ "Gombak transport hub to be ready by 2019". www.thesundaily.my. Retrieved 2020-05-08.
- ^ Minderjeet Kaur (2006-04-01). "9MP Report: Transport hubs to ease travel woes". New Straits Times. Archived from the original on 2008-05-27. Retrieved 2008-07-01.
- ^ "Mahathir explains why ECRL realigned to the south". Malaysiakini. 2019-04-15. Retrieved 2020-05-08.
- ^ Emmanuel Santa Maria Chin (13 April 2019). "New ECRL route without Gombak stop defeats its original purpose, says Najib". Malay Mail. Retrieved 8 May 2020.
External links
- Kuala Lumpur MRT & LRT Integration
- Syarikat Prasarana Negara Bhd
- v
- t
- e
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- B1
- Batu Caves
- Taman Wahyu
- Kampung Batu
- Batu Kentonmen
- Sentul
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Mid Valley
- Seputeh
- Bandar Malaysia South (planned)
- Salak Selatan
- Bandar Tasik Selatan
- Maju KL (planned)
- Serdang
- Kajang
- Kajang 2
- UKM
- Bangi
- Batang Benar
- Nilai
- Labu
- Tiroi
- Seremban
- Senawang
- Sungai Gadut
- Rembau
- Pulau Sebang/Tampin
- Tanjung Malim
- Kuala Kubu Bharu
- Rasa
- Batang Kali
- Serendah
- Rawang
- Kuang
- Sungai Buloh
- Kepong Sentral
- Kepong
- Segambut 2 (future)
- Segambut
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Abdullah Hukum
- Angkasapuri
- Pantai Dalam
- Petaling
- Jalan Templer
- Kampung Dato Harun
- Seri Setia
- Setia Jaya
- Subang Jaya
- Batu Tiga
- Shah Alam
- Padang Jawa
- Bukit Badak
- Klang
- Teluk Pulai
- Teluk Gadong
- Kampung Raja Uda
- Jalan Kastam
- Port Klang
- Sentul Timur
- Sentul
- Titiwangsa
- PWTC
- Sultan Ismail
- Bandaraya
- Masjid Jamek
- Plaza Rakyat
- BBCC–Hang Tuah
- Pudu
- Chan Sow Lin
- Cheras
- Salak Selatan
- Bandar Tun Razak
- Bandar Tasik Selatan
- Sungai Besi
- Bukit Jalil
- Sri Petaling
- Awan Besar
- Muhibbah
- Alam Sutera
- Kinrara BK5
- Kinrara BK3 (planned)
- IOI Puchong Jaya
- Pusat Bandar Puchong
- Taman Perindustrian Puchong
- Bandar Puteri
- Puchong Perdana
- Puchong Prima
- Kampung Sri Aman (planned)
- Putra Heights
- Gombak
- Taman Melati
- Wangsa Maju
- Sri Rampai
- Setiawangsa
- Jelatek
- Dato' Keramat
- Damai
- Ampang Park
- KLCC
- Kampung Baru
- Dang Wangi
- Masjid Jamek
- Pasar Seni
- KL Sentral–redONE
- Bank Rakyat–Bangsar
- Abdullah Hukum
- Kerinchi
- Universiti
- Taman Jaya
- Asia Jaya
- Taman Paramount
- Taman Bahagia
- Kelana Jaya
- Lembah Subang
- Ara Damansara
- CGC–Glenmarie
- Subang Jaya
- SS15
- SS18
- USJ 7
- Taipan
- Wawasan
- USJ 21
- Alam Megah
- Subang Alam
- Putra Heights
- Kwasa Damansara
- Kwasa Sentral
- Kota Damansara
- Surian
- Mutiara Damansara
- Bandar Utama
- Taman Tun Dr Ismail–Deloitte (TTDI)
- Phileo Damansara
- Bukit Kiara Selatan (planned)
- Pavilion Damansara Heights–Pusat Bandar Damansara
- Semantan
- Muzium Negara
- Pasar Seni
- Merdeka
- Pavilion Kuala Lumpur–Bukit Bintang
- Tun Razak Exchange–Samsung Galaxy (TRX)
- Cochrane
- AEON–Maluri
- Taman Pertama
- Taman Midah
- Taman Mutiara
- Taman Connaught
- Taman Suntex
- Sri Raya
- Bandar Tun Hussein Onn
- Batu 11 Cheras
- Bukit Dukung
- Sungai Jernih
- Stadium Kajang
- Kajang
|
Phase 1 Opening 2025 | |
---|---|
Phase 2 |
3°13′52.4″N 101°43′27.9″E / 3.231222°N 101.724417°E / 3.231222; 101.724417