Bicaz-Stejaru Hydroelectric Power Station
Dimitrie Leonida (Stejaru) Hydro Power Plant is a hydropower development on the Bistrița River, near Bicaz, Romania.
The project was started and finished in the 1950s. It consists of a dam, a reservoir, and a hydro power plant.
The dam is a reinforced concrete structure with a height of 127 m (417 ft). It formed and holds the Bicaz Lake reservoir, also known as Mountain Spring Lake ("Lacul Izvorul Muntelui").
The reservoir is the largest artificial lake in Romania; it manages river levels downstream, provides fishing, attracts tourism, fuels the power plant, and controls flooding.
The Oak Hydro-power plant ("Hidrocentrala Stejaru") is equipped with six turbines (four-27.5 MW and two-50 MW turbines) for a total installed capacity of 210 MW. The plant generates an average of 500 GWh of electricity per year, at a capacity factor of 30%; it has produced over 20 billion MWh of electricity in the first 50 years since commissioning.
See also
- Izvorul Muntelui Lake
References
- ^ "Bicaz hydropower development –"Dimitrie Leonida" (Stejaru) hydropower plant". Hidroelectrica. Archived from the original on 5 July 2013. Retrieved 19 April 2013.
External links
- Description Archived 2013-07-05 at archive.today at the official Hidroelectrica website
- v
- t
- e
Coal and oil |
|
---|
Natural gas |
|
---|
- Iron Gate I - 1,168 MW
- Tarnița – Lăpuștești - 1,000 MW
- Iron Gate II - 591 MW
- Lotru-Ciunget - 510 MW
- Râul Mare - 335 MW
- Mărișelu - 221 MW
- Vidraru - 220 MW
- Bicaz-Stejaru - 210 MW
- Ruieni - 153 MW
- Nehoiașu - 152 MW
- Oașa - 150 MW
- Șugag - 150 MW
- Remeți - 146 MW
- Brădișor - 115 MW
- Tismana - 106 MW
- Cernavodă Nuclear Power Plant - 1,300 MW
- Sinus Holding - 700 MW
- Fântânele-Cogealac - 600 MW
- Blackstone - 500 MW
- Deleni - 500 MW
- Eolica Cogealac - 448 MW
- Mărişelu - 300 MW
- Eolica Săcele - 252 MW
- Eolica Casimcea - 244 MW
- Văcăreni - 240 MW
- Verbund Casimcea - 225 MW
- Green Energy - 200 MW
- Pechea - 150 MW
- Sabloal Valea Dacilor - 147 MW
- EDP Cernavodă - 138 MW
- Eolica Beidaud - 128 MW
- Eolica Baia - 126 MW
- Eolica Sarichioi - 102 MW
- Gheorgheni - 100 MW
- Arad 1 - 1044 MW
- CEF Nadab 1 - 363 MW
- CEF Nadab 2 - 302 MW
- CEF Bucșsani - 221 MW
- CEF Corbii Mari - 217 MW
- CEF Iepurești - 165 MW
- Rătești - 155 MW
- CEF Vadeni 1 - 145 MW
- CEF Vadeni 2 - 145 MW
- CEF Calugăreni 2 - 121 MW
- CEF Dobra - 117 MW
- CEF Vacarești - 108 MW
This article about a Romanian building or structure is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e
This article about a hydroelectric power plant is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e